ENVIRONMENTAL DRILLING PROJECTS
No two
environmental drilling projects are alike. Our crews are flexible and know every option that can be applied to your project. This is a sampling of the hundreds of high-profile projects we’ve
safely and successfully completed for our clients.
Location
|
Value
|
Rig Types
|
| Railroad Tie Treatment Facility, Oregon |
|
Limited access rigs, auger |
Description:
To auger drill 23 water-flooding wells and abandonment of four monitoring wells to depths of 90-feet. Rock coring of basalt. Auger drilling with air rotary Odex rig to install 17-8" diameter DNAPL extraction wells and 6-8" hydraulic containment wells. |
Location
|
Value
|
Rig Types
|
| Santa Monica, CA |
>$1,000,000 |
Limited access rigs, auger. |
Description:
Auger drilling to install over 800 ERH electrodes, temperature points and vapor extraction wells up to 65' in depth. As many as six rigs were used to maintain project schedule. Installation of multiple soil vapor wells, vent points and temperature points. 85% of the project was drilled inside a building utilizing specialized limited access rigs with overhead clearances as low as 8'. |
^ top
Location
|
Value
|
Rig Types
|
| Southern California |
>$1,000,000 |
Hollow Stem Auger, Sonic, Direct Push, Vacuum Truck pre-drilling hole clearance rig. |
Description:
Drilled multiple injection and extraction wells to depths of 200’. Wells were originally specified to drill mud rotary due to the depth. Cascade worked with the client to determine the most cost effective drilling method for the project. In the end, it was determined that the project could be completed with Hollow Stem Augers, saving the client a substantial amount of money. |
Location
|
Value
|
Rig Types
|
| Industrial facilities with petroleum, solvent and PCD and dioxin contamination; Northwestern Washington State |
>$850,000 |
Hollow Stem Auger, Sonic, Direct Push, Vacuum Truck pre-drilling hole clearance rig |
Description:
Drill and set 150 - 2" monitoring wells up to 25' in depth with hollow stem auger. Holes pre-cleared for utility clearance with a vac truck. Initial site investigation with direct push rig and both full-sized and compact sonic rigs. Drill and install multiple thermal remediation wells, electrodes and temperature monitoring wells. Sites facilities had challenging, difficult access. |
^ top
Location
|
Value
|
Rig Types
|
| Retail gasoline filling stations; Puget Sound Region, Washington State |
>$3,000,000 per year |
|
Description:
Drill and set in excess of 800 - 2" monitoring wells per year for all major gasoline retailers. Depths from 10' up to 150' with hollow stem auger, direct push, air rotary, and sonic –full size and compact. Holes pre-cleared for utility clearance with a vac truck. Most sites are active and drilled with full safety barricades with minimal facility disruption. |
Location
|
Value
|
Rig Types
|
| Wood treating facility; Puget Sound Region, Washington State |
>$1,000,000 |
Hollow Stem Auger, Hydropunch water sampling, Vacuum Truck pre-drilling hole clearance rig. |
Description:
Drill and set in excess of 100 - 2" monitoring wells from 50' up to 100' with hollow stem auger. Work involved CME continuous soil sampling and multiple hydropunch water sampling. |
^ top